How to plan a renovation: from tasks to timeline in 6 steps
You plan a renovation backwards: what has to be finished, which work depends on which, and how long each takes. Six steps give you a schedule that holds up, and one you can adjust when something shifts.
Step 1: write down what has to happen
Start with a list, per room or per trade. No dates yet. Anything you leave out comes back later as extra work.
Step 2: fix the order
The order is the most important part of the schedule. A wrong order costs more time than a slow tradesperson.
Step 3: estimate the duration of each task
Ask the tradesperson. Add lead times, and time to dry or cure: a screed, plaster or sealant sits idle for a while before the next step.
Step 4: start from the end date
If you have a fixed date, such as a move, work backwards. Then you see straight away whether it fits, and when you must order by.
Step 5: plan the waiting time too
Not everything is work. Delivery, curing and inspections take time in which nobody does anything. Add them as separate steps, otherwise the schedule looks shorter than it is.
Step 6: make it move with changes
A schedule is never finished. Something always shifts. Record the dependencies, so a change carries through to everything after it. Then you do not have to revise the whole schedule by hand after every change.